skip to Main Content
+44 2380 636330 info@saxlund.co.uk  Deutschland   Sverige

References

Saxlund References

Saxlund Piston Pump

Reception of Sludge Cake at WWTP Stuttgart

Complete system comprising of Saxlund Push Floor Reception Bunker, two Saxlund Piston Pumps, Saxlund Sliding…

read more
Margam Waste Wood Power Station

Teeside Waste Wood Power Station

Saxlund supplied a system comprising of an overhead crane, screening and conveying for a 125MWth…

read more
Margam Waste Wood Power Station

Margam Waste Wood Power Station

Saxlund supplied a system comprising of an overhead crane, screening and conveying for a 125MWth…

read more
Saxlund Piston Pumps For Sludge Cake

Sludge Cake Reception, Storage and Pumping at Hamburg Water

Saxlund supplied one reception bunker with Saxlund Push Floor discharger, two Saxlund Piston Pumps, one…

read more
Saxlund Piston Pumps

Sludge Handling at WWTP Karlsruhe

One Sludge Cake Truck Reception Bunker fitted with Saxlund Push Floor Discharger into two Saxlund…

read more
Doha- Qatar, Sludge Silos

Sludge Silos and Pumps for Doha, Qatar

Four sludge cake silos fitted with Saxlund Sliding Frame Dischargers, feeding four Saxlund Piston Pumps.

read more
Saxlund Piston Pump

AEB Amsterdam

Sewage sludge incineration system, with reception bunker and Saxlund solids piston pump.

read more
Saxlund BioEnergy Plant

Norraskogsägarna – 10m Hot Water

The facility supplied for Northern Forest in Savar provide hot water for wood kilns. This…

read more
Saxlund BioEnergy Grate And Combustor

Nässjö – 12MW Hot Water

The facility at Nässjö Affärsverk was installed to provide the summer heating requirements and meet…

read more
Saxlund BioEnergy Plant, Generating Heat From Biomass

Dalkia 16MWth Hot Water

The plant supplies hot water to Setra sawmill kilns and provision has been made for…

read more
Saxlund BioEnergy Plant, Energy From Biomass

Skara 8MWth

The BioEnergy Plant supplied at Skara Energy was installed as part of an expansion to…

read more
Truck Loading Silo For Animal Feed

Storage and Lorry Loading System – British Sugar

The pressed sugar beet pulp is fed to the Saxlund truck loading silo by belt…

read more
Saxlund Tyre Chip Push Floor

Tyre Chip Handling Bunker -Castle Cement

Saxlund International Ltd supplied a tyre chip truck reception bunker equipped with the Saxlund Push…

read more
SRF Push Floor Bunker To Feed Waste To Energy Power Station

Slough Heat and Power RDF/SRF Push Floor

Slough Heat & Power supply electrical power and some district heating within the Slough Trading…

read more
Push Floor Bunker For Cement Plant

Lagoon Ash Reception Bunker with Push Floor Discharger – Castle Cement

Saxlund International won the contract to supply this Reception Bunker for the Ribblesdale Cement Works…

read more
Saxlund Push Floor Under Construction

Paper Sludge Truck Loading – Kimberly Clark

Saxlund International won the contract to supply a Push Floor stockpile reclaimer and truck loading…

read more
Truck Reception Bunker For Sludge Cake At A Waste Water Treatment Works

Truck Reception – Budd’s Farm STW

The purpose of this plant is to receive de-watered sewage sludge cake into the Budd’s…

read more
Avonmouth Silos

Two Truck Loading Silos – Avonmouth WWtW

Digested and limed sewage sludge cake. Both silos are equipped with the Saxlund Sliding Frame…

read more
Truck Loading Silo With Sliding Frame And Odour Enclosure

Truck Loading Silo with Sliding Frame – Scarborough WtW

Saxlund International Ltd won the contract to supply this truck loading silo for Scarborough Sewage…

read more
Large Truck Loading Silo With Sliding Frame And Discharge Chain Conveyor

Sliding Frame Sludge Silo – Farnham

The Thames Water Trident Alliance chose Saxlund International to supply this prestigious and unusual limed…

read more
Didcot Power Station Push Floor

Biomass Co-Firing Didcot Power Station

Saxlund International UK won the contract to supply a biomass handling system for the new…

read more
Aberthaw Power Station Push Floor

Biomass Reception, Screening & Conveying – Aberthaw

Saxlund was awarded the contract to automate the biomass co-firing pilot plant at Aberthaw Power…

read more
4 Push Floor For Biomass

Biomass Reception & Storage System – Fiddlers Ferry Power Station

The two stockpile Push Floor discharge machines each hold 1000m³ of material. The material is…

read more
Slough Heat And Power Push Floor

Biomass Push Floor – Slough Heat & Power

Saxlund supplied one stockpile Push Floor discharge machine with a capacity of 200m³. The stockpile…

read more